DENTAL CLINIC INTERIOR DESIGN AND FITOUT – 3 KEY AREAS OF FOCUS FOR A SUPERIOR SURGERY LAYOUT

With 30 years of experience, our team of experts in dental clinic design and construction brings a unique approach to transforming your practice. Using our proven process and a specialist construction team, we focus on improving both Patient Experience (PX) and User Experience (UX).

Our services cover every aspect of creating a functional and appealing dental environment, including dental office design, ergonomic surgery layouts, and thoughtful office interior solutions. We prioritise functionality and practice design to ensure your space meets both aesthetic and practical needs. We currently cover London, Birmingham and areas across the South East of England. 

Our design and fit-out process is organised into clear stages, providing a road map from concept to completion. From innovative reception ideas to optimised surgery layouts and equipment integration, we manage every detail. Additionally, we offer comprehensive dental surgery refurbishment services to upgrade existing practices.

DEFINE

Our workspace planning service lays the foundation for our design service by getting to the heart of the way you want to work. A dental architect understands the nuances of dental architecture. Our Dental Architects allow us to present the perfect experience from beginning to end.

We will take the time to understand the location and function of each surgery, the ‘patient journey’ and your needs in terms of access, dental surgery layout ergonomics, lighting, storage, mechanics, electrics and more. We will also analyse how you use your current space and identify areas for improvement.

We will help with creating brand new practices, refurbishments and individual surgeries. We bring the same insight and attention to detail to every project.

DESIGN

With 30 years of experience, we specialise in helping you design a dental surgery that reflects your unique needs and aesthetic preferences. Our goal is to create a space that aligns with the way you work while expressing your professional individuality.

The interior design of your dental surgery plays a key role in making a positive and lasting impression on patients. It not only helps to put them at ease but also allows you to create the atmosphere you envision—whether calm and traditional or fresh and modern.

Our approach ensures we maximise the potential of your workspace by designing surgeries from the “mouth-out,” focusing on functionality and flow rather than starting with the walls.

DELIVER

A project well planned is half-done!. For complex assignments, efficient project management and effective liaison between all parties involved is essential.

We will take on the stress of your project, saving you time and delivering peace of mind. We appreciate that every day of surgery downtime is expensive, so we aim to minimise disruption as much as possible.

We have extensive insight into the optimum solutions to technical issues related to plant and equipment services, as well as in-depth industry knowledge of specialist companies who can add value to your project and ensure success.

Ergonomic Cabinetry Design for Seamless Workflow

At Anglian Dental, we understand that the efficiency of your clinical workspace depends on the careful planning of every millimetre. Our ergonomic cabinetry solutions are designed around the daily routines of your dental team, ensuring instruments and consumables are always within easy reach while maintaining clear, clutter-free surfaces.

We create cabinetry layouts that enhance the natural flow of your surgeries, reduce unnecessary movement and minimise fatigue during long clinical sessions. Every unit is designed for durability, easy maintenance and precise integration with your equipment, helping to maximise productivity and maintain a professional, organised environment that supports both patient and practitioner comfort.

Infection Control at the Heart of Every Design

Infection prevention is fundamental to safe and compliant dental practice design. Our team builds HTM 01-05 compliance into every aspect of your surgery layout, from zoning clean and dirty areas to selecting non-porous, easy-to-sanitise surfaces and finishes.

We design cabinetry and worktops with smooth, seamless edges to prevent dirt traps, and incorporate hands-free taps, touchless waste systems and integrated storage to keep critical surfaces clear. This meticulous approach not only safeguards your patients and staff, but also streamlines decontamination workflows, reducing turnaround times between appointments while ensuring your practice exceeds current infection control standards.

THE 7 STAGE OYSTERTM PROCESS FOR THE BEST POSSIBLE DESIGN AND FIT-OUT OF YOUR DENTAL SURGERY:

STAGE ONE – SPATIAL PLANNING AND ROOM LAYOUTS

  • Detailed analysis of premises and consideration for client needs, ideas and business goals. Consideration for patient, dentist and nurse flow through the practice.
  • Consideration of dental surgery layout ergonomics for comfort and efficiency with a dental architect.
  • Professional measured survey by a specialist surveyor.
  • Preparation of sketch floor plans using Computer Aided Design software (CAD), scaled 1:50, showing proposed and conceptual layout plans.
  • Site visit by a dental design consultant for discussions about proposed designs including consideration for patient flow, fire regulations, DDA compliance and HTM01-05 compliance.
  • Refining and rework of sketch proposal.

TIMESCALE: 2 WEEKS

STAGE TWO – BUILDING REGULATIONS

  • The drawings will consist of site plan, location plan, general arrangement plans with all basic construction information and layout of fire alarm, generic finishes (e.g. painted wall but not specification of colour etc.)
  • Preparation of access statement including liaison with building inspector and submitting drawings and forms.
  • Liasion with an approved building inspector. 

TIMESCALE: 3-6 WEEKS

dental interior design

STAGE THREE – DETAILED DRAWINGS

Liaison with external consultants (plumber, electrician, HVAC suppliers, contractor etc.) We would prepare a full set of manufacturing drawings ready for production of all the fixed furniture items (reception desk, storage etc). We will also further update the general arrangement plans to show the integration of detailed design elements, lighting, and HVAC.

Include production of room service drawings detailing required positions for all chair and cabinetry services needed for the building contractors to start work. Plumbing runs for suction pipework and compressor pipework given consideration. Plant housing, like suction pump and compressor assessed with the client and located in optimum position. All services are designed to be ‘future proofed’ to facilitate changing requirements with technological advances. 

TIMESCALE: 4-8 WEEKS*

*Which will vary, subject to authority approval and council.

Dental Architects

STAGE FOUR – BRANDING, GRAPHIC AND INTERIOR DESIGN

Preparation of a new brand identity, colour scheme and artwork for window vinyl and internal promotional graphics. Design production for new shop front signage.

Detailed interior design discussions with the client about colour schemes and practice branding to ensure an in-depth understanding of the patient experience to be achieved.

Includes coloured 3D perspective visuals to show materials and finishes. Sample boards of all finishes. Updating general arrangement drawings and elevations with finishes chosen. 

TIMESCALE: 2-4 WEEKS

dental architects

STAGE FIVE – PROJECT INITIATION

  • Design Review
  • Choices Finalised
  • Scheduling and site details agreed to ensure minimum disruption.
  • Notify building control and HSE as required.
  • Construction Design Management (CDM) documentation and procedures put in place. 

TIMESCALE: 1 WEEK

dental surgery design uk

STAGE SIX – INSTALLATION

  • Site work commences – construction, plumbing, electrics, flooring, HVAC, decorations.
  • Cabinetry installation planned and carried out.
  • Dental equipment installation planned and carried out.
  • Regular site meetings held to keep the project running to plan.

TIMESCALE: 1 WEEK

dental surgery design uk

STAGE SEVEN – PROJECT HANDOVER AND TRAINING

  • Equipment cleaning and maintenance sessions.
  • Operations and maintenance manual produced.
  • Cabinetry and equipment tweaks as required.
  • Equipment installation certificates 

TIMESCALE: 2 WEEKS

EXPLORE OUR DENTAL CLINIC DESIGN PICTURES

Reception Furniture

REFRESH DENTAL

YOUR DENTIST IN THAME

ELLEVEN DENTAL

DENTAL RECEPTION DESIGN IDEAS

Are you looking for design ideas for your dental reception area? Below are a few images of designs from some of our reception area refurbishments completed to date, to give you some inspiration. This is by no means a comprehensive gallery of our work, but rather a sample of the reception designs we have completed. Following an initial design consultation, we can provide 3D visuals to help you to understand the concepts we come up with. Contact Us today for fully costed dental reception area layout ideas.

If you are wondering about dental surgery design guidelines, we recommend that you give us a call today and we can discuss your needs and aspirations with you while ensuring that we don’t compromise on what is legally necessary.

Anglian dental project lighting

DENTAL CLINIC DESIGN PICTURES

Are you looking for inspiration for your surgery design? Below are a few of the projects that Anglian Dental have completed. From ultra sterile white designs to warm, comforting wood tone and ivory designs and even modern, energetic designs with bright colours, the design team at Anglian awaitsawait to turn your ideas, dreams, and desires into reality. Our design team can help you bring your professional image to life before completion as well with 3D renders and concept drawings allowing you to visualise design, form and function before building or renovation starts! Contact Us today to get started. 

Frequently Asked Questions

How much does a dental clinic design and fit-out project typically cost?

Every project is different, so costs depend on the size of your practice, the specification of finishes and equipment, and the level of refurbishment required. We provide a fully costed proposal after your initial consultation so you can make informed decisions before committing.

Can you work to a fixed budget?

Yes. Once we understand your goals, we can tailor our design, materials and equipment recommendations to suit your agreed budget, helping you achieve the best possible result without unexpected costs.

Will my practice have to close during the fit-out?

We aim to minimise downtime as much as possible. In many cases we can phase the work so that parts of your practice remain operational while others are refurbished, helping you continue treating patients during the project.

How long does the whole design and build process take from start to finish?

Typical projects take between 12 and 24 weeks depending on complexity, planning approvals and the number of surgeries being created or refurbished. We will give you a realistic schedule before work begins.

Do I need planning permission or building regulations approval?

Some projects do require building regulations approval, and occasionally planning permission. We handle all liaison with building control and can advise if planning permission is needed, preparing and submitting all required documents for you.